Choose Your Lot

Choose Your Lot

  • Reserve a lot by placing a refundable deposit on the home site.
  • If you already own a lot, we can build it on it too.
Design Meeting

Design Meeting

  • Meet with the architect/project manager to decide on the plan design and customization.
  • Determine major structural and mechanical items needed for a building permit.
  • Discuss initial pricing based on approved details.
  • Spec out house (bid how you want)
  • Discuss materials you want and bid for those items
Purchase Agreement

Purchase Agreement

  • Sign a purchase agreement based on base pricing and any required structural changes.
Survey and Permit

Survey and Permit

  • Place survey stakes on the lot site.
  • Apply for a building permit with the city after approval of structural details.
Let’s Build!

Let’s Build!

  • Construction begins upon receiving the city building permit.
Preparation of the Building Site

Preparation of the Building Site

  • Clear, level, and excavate the lot as necessary for construction.
Spec Meeting

Spec Meeting

  • Finalize finer details such as exterior colors, places to go for selections, interior selections/subcontractor, and selection guide book.
Vendor Meetings

Vendor Meetings

  • Visit showrooms to make selections in person.
Construction Phases

Construction Phases

  • Excavation : Footings and basement are dug.
  • Framing : Exterior walls and roof are installed.
  • Exterior Finish : Weather-dependent completion of the exterior.
  • Electrical/ Low Voltage Selections : Walkthrough with the electrician and low voltage company.
  • In the Walls : Installation of electrical, plumbing, HVAC, and low voltage lines.
  • Drywall : Hanging sheetrock, taping seams, and texturing ceilings.
  • Paint : Spray a primer to the walls and paint the ceilings
  • Flooring – Part One : Installation of wood, vinyl, and tile flooring.
  • Woodwork : Delivery and installation of cabinets, doors, and millwork.
  • Interior Finish : Paint or stain all of the woodwork and walls
  • Flooring – Part Two : Installation of any carpeting chosen.
  • Getting Close : Installing shelving, appliances, and thorough cleaning.
Orientation

Orientation

  • Job supervisor conducts a walkthrough, provides information, and addresses questions.
Closing

Closing

  • Homeownership is finalized in the closing process.